1998 – Auditing Geotechnical Risk
Hsin Hsin, Lukang, Taiwan Accomplished full geotechnical audit for offshore land reclamation of three new industrial islands in typhoon threatened zone. Including
1997 – Designing Road Geotechnics
Peasedown St John Bypass, Bath Directing full investigations for 5km bypass with disturbed and landslipped Jurassic soils and rocks. Expediting most cost
1996 – Engineering Tropical Soils
Power Station, St Lucia, Windward Islands Non-engineered back-filling of a tropical valley was investigated between 1988-91 for the new Cul-de-Sac power station
1995 – Stabilising Stone Mines
Combe Down, Bath In 1988-89 open-cast quarries and shallow stone mines at The Brow were investigated by trenching and rock probing for
1994 – Implementing Cliff Works
Newquay, Cornwall Co-ordinating geotechnical aspects of Cliff Road leisure centre redevelopment at cliff top, with 5m back cantilever, between 1987-1992. Managing cliff stability
1993 – Controlling Investigation Quality
GSZ Superhighway, Southern China Developing appropriate linkage between British Standard ground investigation techniques and equipment and the equivalent available Chinese methodologies. Completing detailed