2017 – Sun, Sand and Solar
Since 2017 Intégrale have completed desk studies, intrusive investigation and detailed risk assessment of this substantial sloping area, covering a succession of Jurassic soils and
2015 – Remediating Historic Mill Complex
Freshford Mill, Bath Remediation work stopped at this site in 2008 when the previous developers went into liquidation. Intégrale completed supplementary validation
2014 – Delivering Rapid Advice
Wroughton Airfield Solar Park One of the largest renewable energy facilities (50 MW) in the UK, it has been in development since 2012;
2013 – Presenting Hydro and Enviro Advice, Asbestos Landfill
Advising Stowey Sutton Action Group (SSAG) At Intégrale, we take our professional responsibility and knowledge very seriously……. to the extent that we
2012 – Founding New Buildings on Gulled Strata
University of Bath and University of Bristol Both University campuses pose inherent foundation difficulties, demonstrated by more than 20 specific projects completed by Intégrale.
2011 – Developing Unusual Foundations
Legoland 4, Gunzberg, Germany Assessing ground investigations, then optimising appropriate foundations for theme park rides and entertainment facilities with unusual static and dynamic spatial
2010 – Maintaining Ongoing Stability
Ulwell Reservoir, Swanage Access to this elevated site is extremely difficult. Signs of superficial slippage in 2000, triggered boreholes investigation and slope analysis; could
2009 – Generating Structural Stability
Brimscombe, Stroud, Gloucestershire Access to two new houses needed a road in a 3-4m cutting that truncated an old mudslide. Initial investigations by others
2008 – Designing Dredged Sideslopes
Ras Tanura, Saudi Arabia Saudi Aramco completed an approach channel, new berths and breakwaters for the Integrated Project. Intégrale provided advice on