1996 – Engineering Tropical Soils
Power Station, St Lucia, Windward Islands Non-engineered back-filling of a tropical valley was investigated between 1988-91 for the new Cul-de-Sac power station and substations. Following detailed seismic risk and reciprocating vibrations assessment, compaction by vibro-replacement was chosen, supervised and a stiff foundation raft constructed. Recent hillside instability was analysed and the critical



