1997 – Designing Road Geotechnics

Peasedown St John Bypass, Bath


Directing full investigations for 5km bypass with disturbed and landslipped Jurassic soils and rocks. Expediting most cost effective geotechnical remedial works, dealing with cambered and gulled limestone, and bank stability. No positive drainage, requiring appropriate location for large-scale soakaway drainage.